DOCSIS Testing

FCC Proof-of-Performance Rules Revisited

By H. Mark Bowers — Revisions to FCC Part 76 Rules were released in April of this year. Significant changes were included in this release, including the rewording of some test procedures and standards, QAM carrier limits for aeronautical frequency notification.

Read More

Basic HFC AC Design (Part Two)

By H. Mark Bowers — Preparation for AC design calculations requires a diagram of all amplifiers (system actives) in a tree-branch configuration as was shown in Part One of this series

Read More

Basic HFC AC Design (Part One)

By H. Mark Bowers — Many technicians struggle with AC design, particularly in the area of proper power supply placement and loading. AC design involves concepts and principles that we don’t use in every day system maintenance or operation.

Read More

Signal Leakage Patrolling at 700 MHz (PART ONE)

By H. Mark Bowers – Newer leakage detection systems are now available that measure at dual frequencies. While {the} present FCC required leakage detection frequency range remains in the 108 MHz to 137 MHz aeronautical band, measurements at higher frequencies can be revealing and may eventually be required

Read More

Scalar Testing (Part Two)

By H. Mark Bowers – In my last column we examined the importance of scalar testing, definitions of various terms, equipment required, and examined waveforms of actual insertion loss and isolation measurements using a spectrum analyzer and tracking generator.

Read More

Scalar Testing (Part ONE)

By H. Mark Bowers – In my last column we examined digital QAM testing requirements under present FCC Part 76 Rules and ANSI/SCTE 40 2003 Requirements. In this column we’ll begin an examination of scalar testing and why it’s important in the HFC network.

Read More

Yeah Baby — Unmanaged DOCSIS Wi-Fi

By Brady S. Volpe – One billion dollars plus is spent yearly on residential unmanaged Wi-Fi accounts, according to CableLabs. You heard me right and I’m not quoting Austin Powers here. How is this possible? Okay, let’s review: Subscribers’ unmanaged Wi-Fi networks are causing a ton of customer service representative (CSR)

Read More

A Review of FCC Proof-of-Performance Testing Requirements

By H. Mark Bowers – As noted in Part One, FCC Proof-of-Performance testing is required once every six months in systems with over 1,000 subscribers: first during January or February, the ‘coldest’ months of the year; and then again during July or August, the ‘hottest’ months of the year.

Read More